Every home is designed for a set of climate numbers: how much snow its roof must carry, how hard the wind can push on it, how cold it gets and how long the heating season lasts. The National Building Code gives those numbers by location, and they change a great deal between Lethbridge, Winnipeg and Churchill. Before a design is approved, a housing manager should get the exact values used for the community in writing.
This post explains where the numbers come from, what climate zones 6, 7A, 7B and 8 mean for insulation, why roof shape matters as much as the snow figure, and what to ask a designer or builder to confirm. It is general information, not engineering or legal advice. Which code applies on reserve, and who inspects, should be confirmed with ISC or CMHC and your inspector.
Where do a home's design loads come from?
Article 1.1.3.1 of the National Building Code of Canada 2020 says the climatic values for design "shall be in conformance with the values established by the authority having jurisdiction." Where the authority has not set them, designers use the values listed in Appendix C. Appendix C's Table C-2 lists design weather recommendations and elevations "for over 600 locations." The data were analyzed by Environment and Climate Change Canada for the commission that writes the code.
Table C-2 gives each location a row of numbers. The ones that matter most for a house are:
- January design temperature (2.5% and 1%). The code says outside winter design temperatures "shall be those listed for the January 2.5% values." Appendix C explains that the 1% and 2.5% values correspond to January temperatures that are colder for 8 and 19 hours, on average. Heating systems are sized from this number.
- Heating degree-days below 18°C. A measure of how long and cold the heating season is. It sets the climate zone, and so the insulation and energy rules.
- Ground snow load (Ss) and rain load (Sr). Ss is based on a snow depth with "an annual probability of exceedance of 1-in-50." Sr is the extra load from rain falling on that snow.
- Hourly wind pressures (1-in-10 and 1-in-50). Reference pressures based on one-hour average wind speeds at 10 m in open terrain.
- Rainfall values (15-minute and one-day), used for roof drainage and for ponding loads if drains fail.
Appendix C is candid about precision. Ss values "typically have an uncertainty of about 20%," and heating degree-days "cannot be relied on to an accuracy of less than about 100 degree-days." That is why the source and location of each number matter.
What happens if your community is not in Table C-2?
Most First Nations and Métis settlements are not named in the table. The NBC 2020 warns that "interpolation from the values in Table C-2 to other locations may not be valid due to local and other effects," and for snow, "values should not be interpolated from Table C-2 for unlisted locations." Note A-1.1.3.1.(2) says values for unlisted places can be obtained from Environment and Climate Change Canada at climate.weather.gc.ca or by e-mail from its Engineering Climate Services Unit at scg-ecs@ec.gc.ca.
So a designer should not simply borrow the nearest town's row. Ask whether the values came from a named Table C-2 location, from Environment and Climate Change Canada for your community, or from the authority having jurisdiction.
How different are the numbers across the Prairies and the North?
The spread is large. These rows are read directly from Table C-2 of the NBC 2020:
- Lethbridge, Alta.: January 2.5% design temperature -30°C, 4,500 degree-days, Ss 1.2 kPa, 1-in-50 wind pressure 0.66 kPa.
- Regina, Sask.: -34°C, 5,600 degree-days, Ss 1.4 kPa, wind 0.49 kPa.
- Winnipeg, Man.: -33°C, 5,670 degree-days, Ss 1.9 kPa, wind 0.45 kPa.
- Prince Albert, Sask.: -37°C, 6,100 degree-days, Ss 1.9 kPa, wind 0.38 kPa.
- The Pas, Man.: -36°C, 6,480 degree-days, Ss 2.2 kPa, wind 0.37 kPa.
- Thompson, Man.: -40°C, 7,600 degree-days, Ss 2.4 kPa, wind 0.36 kPa.
- Uranium City, Sask.: -42°C, 7,500 degree-days, Ss 2.0 kPa, wind 0.36 kPa.
- Churchill, Man.: -38°C, 8,950 degree-days, Ss 3.0 kPa, wind 0.55 kPa.
The ground snow load at Churchill is two and a half times Lethbridge's, and the coldest place is not always the snowiest or windiest. Each load has to be checked for the actual site.
What do climate zones 6, 7A, 7B and 8 mean for insulation and energy?
Section 9.36 of the NBC 2020, the energy efficiency rules for houses and small buildings, sorts locations into zones by heating degree-days: Zone 6 is 4,000 to 4,999, Zone 7A is 5,000 to 5,999, Zone 7B is 6,000 to 6,999 and Zone 8 is 7,000 or more. Using the rows above, Lethbridge falls in Zone 6, Regina and Winnipeg in 7A, Prince Albert and The Pas in 7B, and Thompson, Uranium City and Churchill in Zone 8. Alberta's energy codes page puts it simply: "The climate zones are determined according to heating degree-day (HDD) zones."
The zone sets the minimum effective thermal resistance (RSI) of each assembly. In Table 9.36.2.6.-A, for a house without a heat-recovery ventilator:
- Ceilings below attics need RSI 8.67 in Zone 6 and RSI 10.43 in Zones 7A, 7B and 8.
- Above-ground walls need RSI 3.08 in Zones 6 and 7A, rising to RSI 3.85 in Zones 7B and 8.
- Floors over unheated spaces need RSI 4.67 in Zone 6 and RSI 5.02 in Zones 7A to 8.
Table 9.36.2.6.-B allows lower wall values where the ventilation system includes heat recovery: RSI 2.97 in Zones 6 and 7A, and RSI 3.08 in 7B and 8. So a wall that passes in Winnipeg may not pass in Thompson. For a factory-built home designed once and delivered to many places, confirm that the design was checked for the zone of your community, not the plant's.
The 2020 code added energy performance tiers. Its Table 9.36.8.2 says "Tier 1 represents compliance with the baseline energy efficiency requirements." Higher tiers require more, measured either by energy modelling or by earning energy conservation points. Provinces choose the tier they enforce:
- Manitoba is adopting the 2020 national codes effective January 1, 2024, and "is initially adopting the baseline Tier 1," with extra heat-recovery ventilation requirements for homes (Manitoba).
- Saskatchewan said in December 2023 that the 2020 codes take effect January 1, 2024, with "Tier 2" for smaller buildings, including houses (Saskatchewan, 2023). In February 2025 it announced a return to Tier 1 for housing and small buildings, "effective with approval of regulatory amendments" (Saskatchewan, 2025). Check the current rule before you write a spec.
- Alberta lists the National Building Code – 2023 Alberta Edition as in force, with its first printing "declared in force May 1, 2024" (Alberta).
Tier 1 is a legal floor, not a target. Heating costs and envelope choices beyond the minimum are covered in our post on heating costs in northern homes.
Why do roof shape, drifting and wind matter so much?
The ground snow load is only the start. Part 9 of the NBC 2020 calculates a house roof's specified snow load from Ss, Sr and a basic roof factor, Cb, which "is 0.45 where the entire width of the roof does not exceed 4.3 m and 0.55 for all other roofs." In no case may the specified snow load be less than 1 kPa.
The simple Part 9 method has limits. The code's explanatory note says it "is not applicable to roof configurations that seriously exacerbate snow accumulation," such as high parapets and large projections above a flat roof. Where a roof step is more than 2 m high and the upper roof is nearly flat and larger than 600 m², the lower roof must carry at least 1.5 times the normal snow load within the drift length.
For larger buildings designed under Part 4, the code adds factors for wind exposure, roof slope and accumulation. The accumulation factor must account for snow drifting onto a lower roof, including a roof lower than "another building within 5 m of it horizontally," plus drifts beside roof projections, uneven loads on gable roofs, snow sliding, and roof valleys. Flat roofs and low-slope gable roofs must also be checked for a full load on one portion and half load on the rest.
For a housing manager, the practical questions are: is a porch roof or addition sitting below a higher roof, are buildings being placed close together, and will a later addition create a new step? Each can change the snow load on part of a roof designed for uniform snow.
Wind affects how the roof is held down and how the house is held to its foundation. In Part 9 of the NBC 2020, where the 1-in-50 hourly wind pressure is 0.8 kPa or more, rafters, joists or trusses "shall be tied to the wall framing with connectors that will resist a factored uplift load of 3 kN." Higher wind pressures also trigger extra anchor-bolt requirements for buildings of two or more storeys. Values differ by site, so ask for yours.
Wind also cuts the other way for snow. For Low and Normal Importance buildings fully exposed to wind on open terrain, the Part 4 wind exposure factor may be reduced "to 0.75 for rural areas only, or to 0.5 for exposed areas north of the treeline." That reduction does not apply where snow drifts from adjacent surfaces, which is why exposure assumptions should be stated in writing.
How does frost depth affect the foundation?
Frost is the one climate value Table C-2 does not give. Article 1.1.3.2 of the NBC 2020 says "Depth of frost penetration shall be established on the basis of local experience." That makes local knowledge, soil information and the foundation designer's judgment central. Foundation depths, surface foundations and skids are covered in detail in our post on site preparation and foundations for factory-built homes; for permafrost and drainage, see siting homes away from flood, fire and thaw.
What should a Nation ask its designer or builder to confirm in writing?
A one-page design criteria sheet, signed by the designer or engineer, avoids most surprises. It can be part of your tender package; see our post on how First Nations tender housing projects. Ask it to state:
- The code and edition used (for example, NBC 2020 or the provincial edition), and who the authority having jurisdiction is for the site.
- The exact location used for climate data: a named Table C-2 row, values from Environment and Climate Change Canada for the community, or values set by the authority having jurisdiction.
- The January 2.5% design temperature and the heating degree-days used.
- The climate zone (6, 7A, 7B or 8) and the energy tier and compliance path, including whether a heat-recovery ventilator is part of the design.
- Ss, Sr and the roof snow load used for the roof framing or trusses, and whether drift loads were checked for roof steps, porches, additions and nearby buildings.
- The 1-in-50 hourly wind pressure and the exposure assumed, and how the roof and floor are tied down.
- The frost depth assumed and the basis for it, and the foundation type.
- That the same values were given to everyone involved, including the plant, the foundation designer and the inspector.
For CMHC Section 95 projects, CMHC's building code compliance page lists three inspections: "pre-backfill inspection (foundation stage)," "pre-drywall inspection (framing, rough-in and insulation/vapour barriers stage)," and "final inspection." It also states that "Your First Nation is responsible for paying all costs related to code compliance inspections." A written design criteria sheet gives your inspector something definite to check against.
One more reason to keep the sheet: the climate data are changing. The NBC 2025 says that "Starting in the 2025 edition, the climatic design data incorporate the effects of future projections of climatic conditions." Provinces adopt new editions on their own schedule, so confirm which edition applies when your project is designed.
Where does a builder fit in?
Herauf Modular, a division of Herauf Enterprises, builds homes and community buildings as finished sections indoors in its plants across Western Canada, then delivers and sets them on site. Every unit meets or exceeds CSA A277 and the National Building Code for climate zones 6 through 8 (see our CSA A277 guide for what the factory label covers). Herauf has built through the off-season for St. Theresa Point First Nation in northern Manitoba and delivered over the winter ice road, and has placed homes for Nisichawayasihk Cree Nation on its rapid portable skid system.
Builds are manufactured in as little as 16 weeks, once the issued-for-construction package is signed off and permit and engineering approval are in, with foundations, pads and services prepared on site at the same time. If you want the design loads for your community confirmed before you commit, send an enquiry. Herauf replies within one business day.
This guide is general information, not legal or financial advice. Program rules change: confirm the details with the program, your Indigenous Services Canada regional office or CMHC before relying on them. Herauf does not administer any program or apply on a community's behalf.