If your Nation borrows to build or buy housing, insurance is not optional. CMHC's Section 95 program requires replacement-cost fire insurance on every unit, with the lender named as first-loss payee, for the life of the loan, and a lapse can suspend your subsidy. The practical job for a housing manager is to keep one accurate schedule of every building, prove coverage at each stage from factory to handover, and work steadily on the things that drive premiums: water supply, fire service and the condition of the homes.
This is general information, not legal, insurance or program advice. Agreements differ from project to project, so confirm the terms that apply to you with your CMHC program advisor, your Indigenous Services Canada (ISC) regional office, your lender and a licensed insurance broker.
What do housing programs actually require you to insure?
The clearest written rules come from CMHC's On-Reserve Non-Profit Housing Program (Section 95). Its Operations Guide says the program operating agreement "requires the First Nation to maintain insurance and provide CMHC with evidence that an adequate level of insurance is in place for all Section 95 housing units." It goes on to state that all Section 95 units "must have fire insurance based on a replacement cost basis with the lender identified as the first-loss payee," and that coverage "is a requirement for the life of the loan."
The consequences are spelled out too. If insurance is not maintained or is inadequate, the guide says "the subsidy will be suspended until appropriate coverage is provided," and eligibility for future housing allocations will also be affected. If an uninsured unit burns, the First Nation is responsible for the cost of repair, replacement or possibly paying out the remaining loan balance on that unit. The guide also recommends keeping coverage after the operating agreement ends, which is sensible: the house still needs replacing if it is lost.
Ministerial Loan Guarantees (MLGs) work alongside this. ISC's MLG manual treats a lender's insurance premiums against fire and other insured risks as reasonable charges the lender can recover if it has to claim on a defaulted loan, and on payment the lender must assign its interests in insurance policies issued under the loan agreement. ISC then works to recover the amounts it paid. In other words, if the Nation lets coverage slide, the cost does not disappear; it comes back to the community. The MLG toolkit also lists a certificate of insurance from CMHC among the items in an application package.
Do not confuse two kinds of insurance that share a word. Mortgage loan insurance protects the lender if the loan is not repaid; CMHC's insured loans for on-reserve housing page explains that "CMHC provides loan insurance to approved lenders" for loans secured by a ministerial loan guarantee. Property insurance protects the building against fire and other losses. Your lender may need both, and the Nation pays for the property policy.
Can ISC funding pay for insurance?
Yes, within limits. ISC's terms and conditions for community infrastructure list "all housing related activities including the day-to-day operation and maintenance, insurance" as eligible, and include insurance among the eligible administrative costs of operating community infrastructure and education facilities. Where a council has opted into the community-based on-reserve housing program, the same terms say it must have a multi-year housing plan that addresses "maximizing the life expectancy of housing through sound maintenance repair and insurance practices."
ISC's fire protection page states that the annual funding it provides to First Nations "can be used for fire protection services as well as fire insurance," with amounts set by regional formulas that consider factors such as the number of buildings on reserve, remoteness and population. ISC's 2024 evaluation of the On-Reserve Housing Program confirms that First Nations can use housing funds to contribute towards insurance, but these are contributions, not full coverage of every cost. For the wider funding picture, see the program-by-program funding guide.
There is also a national goal. ISC's First Nations Fire Protection Strategy, 2023 to 2028 sets strategic objective 3C: "First Nations should acquire insurance for band-owned homes and buildings for fire by 2025." That date has passed. If your community has uninsured buildings, the strategy is still a useful reference when you make the case to council or your regional office.
What should the policy cover: property, liability and contents?
Start with the buildings. Section 95 requires fire coverage at a minimum, and the Operations Guide notes that some communities insure each unit individually while others carry a policy covering all buildings and assets together, commercial and residential. Either can work, as long as every financed unit is listed. A 2024 CMHC Research Insight on Indigenous insurance and risk found that on reserve, property insurance is usually provided at the community level and covers both residential and commercial units, which is why a single, accurate building schedule matters so much.
Tenant contents are the tenant's responsibility. The Operations Guide says occupants "may also decide to get insurance for their belongings," at their own expense. Its sample lease puts it plainly: the First Nation, as owner, bears the cost of fire insurance for the home and the listed appliances, and "the cost of personal contents insurance shall be the responsibility of the tenant." Tell tenants this at lease signing. Many assume the band's policy covers their things; under that model it does not.
The sample lease also shows how deductibles can be shared: the tenant pays the deductible for deliberate or wilful damage, and the First Nation pays it for accidental damage from uncommon events such as fallen trees or wind. Tenants also agree not to do anything that could void the policy. If your lease is silent on these points, your housing policy is the place to fix that.
Liability is the third piece. None of the federal program pages reviewed for this article set a specific liability insurance requirement for band housing or community buildings, so ask your broker and your legal advisor what your council, housing authority and building users need, especially for buildings the public uses.
How do replacement cost and proof of insurance work?
Replacement cost is what it would take to repair or rebuild at today's construction prices. The Operations Guide gives the reason it is required: if a 10-year-old house burns, "it would cost much more to replace the house today than it did to build it 10 years earlier." Without a replacement cost clause, a Nation could receive a payout and still be unable to rebuild. In remote and fly-in communities, where materials and crews travel far, an outdated insured value is a real risk.
The same guide suggests reviewing the policy every year with your agent. Its checklist is worth copying into your annual calendar:
- Are all units identified in the policy, including newly completed ones?
- Are the locations correct, with the correct legal descriptions? The guide warns that wrong descriptions can get a claim "denied on a technicality."
- What is the current deductible, and can the Nation actually pay it?
- What is the insured value of each unit, and is replacement cost coverage identified?
- Are there limits on coverage, or special requirements for vacant units?
- After a loss, which costs will the Nation still have to cover?
Proof of insurance means paperwork the lender can read. CMHC's Section 95 Project Delivery Guide lists, for the final advance, "Current property Insurance showing" CMHC as first loss payee, the lots and locations covered, the replacement (or insurable) value of all units, and the coverage period. Keep the current policy, certificates and your agent's emergency contacts together in your housing files, as the Operations Guide recommends.
What affects premiums, and what can a housing department change?
Insurers price risk, and on reserve the biggest factor is usually fire protection. The Fire Protection Strategy says "Fire insurance rates are driven by the level of fire protection within a First Nation. Critical factors include water supply, fire department and emergency communications," and that improving any one factor can raise the community's fire underwriter survey grading and reduce costs. ISC's Level of Service Standards for Fire Protection Services describes the Fire Underwriters Survey as the organization that rates public fire protection for Canadian communities and publishes the results "for use by insurers in determining property insurance rates."
What that means in practice:
- Water supply and hydrants. ISC's evaluation reports respondents saying that many reserves lack fire hydrants, which can make insurance rates unfeasible, and that obtaining insurance, required for some funding streams and bank loans, is extremely difficult for First Nation homeowners.
- Fire service and distance. The CMHC Research Insight reports that reserves next to towns often share emergency services by agreement, and that these agreements reduce the risk rating because the services are close. Remote communities without that option face higher ratings. The ISC standards also note that fire truck replacement schedules affect insurance grading.
- Alarms and sprinklers. The same CMHC research found insurers treat older buildings without resiliency measures "like sprinklers or fire alarms" as riskier. The Fire Protection Strategy calls for working smoke and carbon monoxide alarms in every on-reserve home and a home sprinkler standard for new homes in some communities. For the practical side, see our article on fire safety in First Nations homes.
- Building condition and records. CMHC's research notes that limited capacity for risk planning and building inspections raises the risk insurers perceive. A documented maintenance program gives your broker evidence to work with at renewal.
None of these changes happen overnight, but each is a line item you can take to council, your ISC regional office and your insurer.
How do you keep coverage through construction, delivery and handover?
A new building moves through several insurance phases, and gaps happen at the handoffs. CMHC's Section 95 guides give a useful template even if your project is funded another way. The Operations Guide says the First Nation "is responsible for ensuring appropriate insurance is in place during the construction process."
For site-built projects, the Project Delivery Guide asks for builder's risk insurance at the accountable advance, then current builder's risk insurance at each progress advance showing CMHC as first loss payee, the lots and locations covered, the replacement value of all units and the coverage period.
For ready-to-move (factory-built) units, the guide asks at the progress advance for "Confirmation of 'in-transit' Insurance from the facility to the site," along with progress photos from the manufacturer. At the final advance it asks for current property insurance and code compliance documents, including the CSA sticker.
A simple sequence to agree in writing before work starts:
- In the plant: confirm whether the manufacturer's coverage protects your units while they are built, and until when.
- In transit: get confirmation of in-transit coverage from the plant to your site, including any winter road or barge leg.
- On site before handover: confirm who insures the units while they are set, connected and finished, and that the coverage names the right first-loss payee.
- At handover: have the Nation's property policy in force on the day risk passes to you, with each new unit listed by its correct location and legal description and at replacement value.
- After handover: add the units to your building schedule and annual review, and give tenants a plain note about contents insurance.
Write the date risk passes into your contract, so no building sits uninsured over a weekend. Your tendering documents are the place to require proof of each contractor's coverage.
Where does a builder fit in?
A builder cannot buy your insurance or decide what your lender needs, but a good one makes the paperwork easier. Herauf Modular, a division of Herauf Enterprises, builds homes and community buildings as finished sections indoors in its plants across Western Canada, then delivers and sets them on site. Every unit meets or exceeds CSA A277 and the National Building Code for climate zones 6 through 8, which gives your insurer and lender clear documentation of how each unit was built.
Builds are manufactured in as little as 16 weeks, once the issued-for-construction (IFC) package is signed off and permit and engineering approval are in, with foundations, pads and services prepared on site at the same time. Set-up on site takes days, which shortens the window between delivery and handover that your coverage has to bridge. Herauf has delivered over long winter routes, including buildings for St. Theresa Point First Nation carried roughly 1,300 km north on the winter ice road, so in-transit coverage is part of the planning conversation from the start.
If you are planning housing or a community building and want to talk through delivery and handover dates your broker can work with, send an enquiry. Herauf replies within one business day.
This guide is general information, not legal or financial advice. Program rules change: confirm the details with the program, your Indigenous Services Canada regional office or CMHC before relying on them. Herauf does not administer any program or apply on a community's behalf.